About 9:30 or so, the man that has done most all my digging work showed up with his trenching machine. He told me that in the middle of the night he awoke thinking that he needed to get my water line trenching done today because it was going to rain soon. So, he showed up unannounced. He wasn't thinking about the fact that we also wanted him to bury the power cable at the same time.....and we hadn't even thought about buying the cable yet.
So, here I am on the phone with our builder again explaining to him that we needed to get our act together and buy our power cable today. We located the needed cable at the REC in Albia. Long story short. By 3 pm and with my checking account $1167 lighter just to buy the cable, both the water line and power cable were trenched 350 feet from the top of the lot to the back side of the house.
Trenching pics...
A lot was accomplished today. Right before 5 pm, it starting pouring rain and the Amish packed up for the weekend. This is what the house looks like after 3 days of framing work.