Tuesday, August 21, 2012

Aug. 21 - Didn't get stoned today

The Centurion Stone guys called this morning to say that they were finishing up another job today and would be back tomorrow to finish the front f the house. So, that was a bit disappointing but I can live with a one day delay to see what the house looks like with stone.

We did get a lot accomplished today, however.

Roger from Moorman Heating was here all day to work on the heat runs for any exterior walls before we do the foam insulation. His young helper couldn't get his butt out of bed this morning. Roger drove and waited in the car for him for 30 minutes..... kept calling him to roust him out of bed but it didn't work. Roger worked all day by himself drilling most of the holes that his young helper was supposed to do.

Tom's guys installed the drain system for screened porch ceiling. It was boxed in with treated 2x6's. Now any moisture that makes it through the decking above will drain outside the screed porch.


Tom, Chuck and Randy mocked up 2 of the gable end 4x4 trim that is a major requirement for this house for me. What do you think? Every gable end will have this look. I'm trying to decide what color to stain these 4x4's and the cedar around the entry and deck posts.


Once we get more 4x4's, all the gables will have the same look.

Like it?


Frank worked on running speaker wire for our lower level surround sound system.




By the end of the day tomorrow, the front of the house will have a completely different look.